cross-posted from: https://lemmy.dbzer0.com/post/32023985

Writing a 100-word email using ChatGPT (GPT-4, latest model) consumes 1 x 500ml bottle of water It uses 140Wh of energy, enough for 7 full charges of an iPhone Pro Max

  • discimus@mander.xyz
    link
    fedilink
    English
    arrow-up
    27
    ·
    29 days ago

    Many data centres use water-based systems to cool the plant with towers evaporating the heat, like a huge perspiration system, which means that the water is lost. It also has to be drinking quality because impurities can damage the servers.

    If anyone was curious like me.

      • MoonMelon@lemmy.ml
        link
        fedilink
        English
        arrow-up
        17
        ·
        29 days ago

        Could do what nuke plants do and have another heat exchanger between the clean water and the water that evaporates, then use less clean water for that loop. If that’s too expensive it just means they aren’t being charged enough for potable water.

      • captainastronaut@seattlelunarsociety.org
        link
        fedilink
        English
        arrow-up
        3
        ·
        29 days ago

        That would take a lot of energy for a facility that is very energy hungry already. It is cheaper to pull in cold water from the mains and flush hot water down the sewer.